Based on this doc the total cost to build this project is US $512m. which is close to Rs 72billion. Which is total of Rs37K per person in Peshawar of 1.9Million people.You can get the most authentic cost details of this project here at this page of Asian Development Bank's Site https://www.adb.org/projects/48289-002/main#project-tenders
Where can we find the total cost to build it and also to operate it? And what will be source of its operation if not subsidy?
Just look at the huge buildings at 00: 15 , 03:53 and 08:53 . These buildings will have park & ride plazas as well as 1200 shops.Now look at 02:17, 04: 51, 05: 15,05: 29 . These are some of the points where feeder route buses will join main route of BRT Peshawar,feeder route of Peshawar BRT is 80 km long.Every bus station will have cycle track and whole route will have a cycle track either elevated or at ground. BHow this project is better than Lahore, Multan, Rawalpindi and Islamabad metros?
Cost of this project is Rs 66 billion. You are calculating as per today's dollar rate yet 75% to 80% of the project is already completed or contracts already awarded at a dollar rate much less than nowBased on this doc the total cost to build this project is US $512m. which is close to Rs 72billion. Which is total of Rs37K per person in Peshawar of 1.9Million people.
Now PTI is in power why they are not using the old train track in Peshawar to use for local Public transportation?
Cost of Rawalpindi Metro was Rs 44 billion and Asad Umer used to say its very expenssive so why Peshawar project is costing us Rs 66Billions? Keep in mind the population of Rawalpindi/Islamabad is way more than Peshawar?Cost of this project is Rs 66 billion. You are calculating as per today's dollar rate yet 75% to 80% of the project is already completed or contracts already awarded at a dollar rate much less than now
Are you saying these Parking plazas are included in construction cost? ADB documents not taking about any parking plazas or might be missing something?Just look at the huge buildings at 00: 15 , 03:53 and 08:53 . These buildings will have park & ride plazas as well as 1200 shops.Now look at 02:17, 04: 51, 05: 15,05: 29 . These are some of the points where feeder route buses will join main route of BRT Peshawar,feeder route of Peshawar BRT is 80 km long.Every bus station will have cycle track and whole route will have a cycle track either elevated or at ground. B
It is not paid by the government but a self-sustaining project. It won't need any subsidiesHow this project is better than Lahore, Multan, Rawalpindi and Islamabad metros?