Nandipur power project generating 100 MW electricity in system: Abid Sher Ali

Kashif Rafiq

Prime Minister (20k+ posts)

??? ???? ???? ???????? ????????? ???
???? ????? 100 ??????? ?? ?????? 18 ??????? ???? ????? ??
??? ???? ???? 430 ??????? ???? 100 ??????? ???? ???? ???? ??

?? ??????
???? ??? ??? ?? ??? ?? ???? ??? 100 ??????? ???? ???? ?? ??? ??
???? ?? 330 ??????? ??? ???????? ??? ???????? ?? ????? ??????? ??? ???? ?? ??? ??

Nandipur power project generating 100 MW electricity in system: Abid Sher Ali


CU5U9kjWoAAM62r.jpg


LAHORE (Dunya News) - State Minister for Water and Power Abid Sher Ali said on Saturday that atleast 100 MW electricity is being included in the system due to Nandipur power project whereas zero percent loadshedding is being conducted in the industries country-wide.

While talking to media in Wapda House, he said that false propaganda is being done against the project as the government is producing electricity from it as needed.

On the directions of Prime Minister (PM) Nawaz Sharif, Abid Sher Ali also announced the re-opening of open courts as complaints regarding over-billing have surfaced recently.

While talking about power-cut duration, the minister stated that six hours loadshedding in the urban and eight hours in the rural areas is being carried out.

Abid Sher Ali said that increased loadshedding is being done due to the line losses and power theft in various areas.


http://dunyanews.tv/en/Pakistan/310551-Nandipur-power-project-generating-100-MW-electrici

CUy5iCEVEAA1C9x.jpg


 
Last edited by a moderator:

ArtistSajid

Citizen
نندی پور حکومت کا گنجی پور


کیا کمال سسٹم بناتےہیں شہبازشریف بھی
سولر پارک، 100 میگاواٹ کا منصوبہ 18 میگاواٹ بجلی بناتا ہے
اور نندی پور، 430 میگاواٹ والا 100 میگاواٹ بجلی پیدا کرتا ہے

جی ہاں۔۔۔
عابد شیر علی نے کہا ہے نندی پور 100 میگاواٹ بجلی پیدا کر رہا ہے
باقی کی 330 میگاواٹ صرف اشتہاروں اور پٹواریوں کے ٹویٹر اکاؤنٹس میں پیدا ہو رہی ہے

[h=2]Nandipur power project generating 100 MW electricity in system: Abid Sher Ali[/h]
CU5U9kjWoAAM62r.jpg
LAHORE (Dunya News) - State Minister for Water and Power Abid Sher Ali said on Saturday that atleast 100 MW electricity is being included in the system due to Nandipur power project whereas zero percent loadshedding is being conducted in the industries country-wide.
While talking to media in Wapda House, he said that false propaganda is being done against the project as the government is producing electricity from it as needed.
On the directions of Prime Minister (PM) Nawaz Sharif, Abid Sher Ali also announced the re-opening of open courts as complaints regarding over-billing have surfaced recently.
While talking about power-cut duration, the minister stated that six hours loadshedding in the urban and eight hours in the rural areas is being carried out.
Abid Sher Ali said that increased loadshedding is being done due to the line losses and power theft in various areas.

http://dunyanews.tv/en/Pakistan/310551-Nandipur-power-project-generating-100-MW-electrici

CUy5iCEVEAA1C9x.jpg


 

Exnooni

Minister (2k+ posts)
مجے لگتا ھے شرلی کو سائیڈ لائن کیا گیا ھے
صرف ٹویٹر اکاؤنٹس میں نہیں، اس فورم پے بی باقی بجلی پیدا کی جا رہی ھے
اگر پکڑے جاتے ہیں تو یو کے کے مثال دے جاتی ہیں
 

AAA101

Senator (1k+ posts)
مجے لگتا ھے شرلی کو سائیڈ لائن کیا گیا ھے
صرف ٹویٹر اکاؤنٹس میں نہیں، اس فورم پے بی باقی بجلی پیدا کی جا رہی ھے
اگر پکڑے جاتے ہیں تو یو کے کے مثال دے جاتی ہیں

Do you have any idea why they give example of uk everytime.. as if Pakistan is on same level
 

Exnooni

Minister (2k+ posts)
Do you have any idea why they give example of uk everytime.. as if Pakistan is on same level

اپنی حفت مٹانے کے لیا
اور یہ بھول جاتے ہیں کہ یو کے بی ٹھیک ٹھاک سزا اور جزا کا قانون بی ہے
 

Back
Top