Metro Bus Project Overhead Bridge Bad Condition, Passengers Protest + Jinnah Hospital 10 Beds ICU W

Machar

Chief Minister (5k+ posts)

[TUNEDOTPK]481321[/TUNEDOTPK]


[TUNEDOTPK]481312[/TUNEDOTPK]


[TUNEDOTPK]481302[/TUNEDOTPK]
 
Last edited by a moderator:

rtabasum2

Chief Minister (5k+ posts)
Dekho-dekho-kaun-aya-Sher-aya-sher-aya.jpg
Picture002_zps397d9a58.jpg
 
Last edited:

abdlsy

Prime Minister (20k+ posts)
total collapse, I mean where is intaezammeyaa, 12 saal pehlae inta burra toe haaal bilkul na thaa right
 

Abdul Allah

Minister (2k+ posts)
Few more things to add
PIC .
only one unit is working for angiography out of 5

About metro bus project.

It is continuously under construction (in the name of maintenance) . specially near Qartba chowak and they say it was COMPLETED in 30 billion