Lahore Metro Shareef VS Amritsar Metro Bus

ArtistSajid

Citizen
???? ?? ???? ???? ??? ???? ????

1zlvtip.jpg



???? ????? ?? ??? ?????? ??? ?? ?? ??????


 
Last edited by a moderator:

Faisal Mian

Minister (2k+ posts)
Bhai iss forum par sirf Meryam Nawaz ky 38 professionals comment karty hain, iss liay iss topic par koi nai aaiey gaa...

Logon koi to IK ke talaq ky mutalaq batao keun kah wohi un ka asal masla hy... yeh sub bekaar ke chezien hain...
 

TONIC

Chief Minister (5k+ posts)
Please don't spread this kind of News...........Nawaz has to take the money which he was not able to earn when Musharraf ousted him BUT look at the brighter side.

Nawaz Nibhayee ga apni yaari
Agli baar phir Zardari
 

ayazahmad1

Politcal Worker (100+ posts)
ترقی، خوشحالی اور بہتری


لاہور: وزیراعلی پنجاب شہباز شریف نے کہا ہے کہ وزیراعظم محمد نواز شریف کی قیادت میں اڑھائی برس میں ملک کو درست سمت میں گامزن کر دیا ہے۔انہوں نے کہا2013 کے مقابلے میں آج کا پاکستان ترقی، خوشحالی اور بہتری کی جانب بڑھ رہا ہے۔ آئندہ اڑھائی برس میں ملک کو پرامن، محفوظ اور ترقی یافتہ بنانے میں کوئی کسر اٹھا نہ رکھیں گے۔ انہوں نے کہاہمارا ہر قدم عوام کے معیار زندگی میں بہتری لانے کی جانب اٹھ رہا ہے۔ 2017 میں توانائی کے متعدد منصوبے مکمل ہونے سے ہزاروں میگاواٹ بجلی نیشنل گرڈ میں شامل ہوگی۔
اور آخر میں میں یھی کھوں گا
شکریہ جنرل راحیل شریف

 

AshRay

Senator (1k+ posts)
itna sannata kioon hey bhai .....

where are all NOONI gone ?????
 
Last edited by a moderator:

stranger

Chief Minister (5k+ posts)
muqadas, burger1, pakistanigujjer, geog, perfectdungar or baki sab ahlian nawaz sharif ko mubarak ho we broke the world records ;)
 

karachii

Minister (2k+ posts)
Re: ترقی، خوشحالی اور بہتری

Shahbaaz Shareer waisay Nawaz Shareer se bari bongia marta hai
 

karachii

Minister (2k+ posts)
Patwari "Fact n Figures" wali thread se aisay bhag jaatay hai jaisay ghaday k sir se seengh.

SHEEERRRRRRRERRRRERRRRRRRERERERRRRRRRRRR
 

Zindabad

MPA (400+ posts)
Please stop blaming sharif family don't u know the paki barhamas family they do,say, watever they like...people of pakiistani deserve leader like Nawaz and zardari geo democracy mein....hahahhahh
 

FahadBhatti

Chief Minister (5k+ posts)
So why was peshawer metro bus project proposed for a cost of 14 billion rupees if it could be done for 10 billion?
 

Pak1stani

Prime Minister (20k+ posts)
Where and when and for what PTI proposed 14 Billion.

Also if Baloki Power plant can be constructed with 460000 USD / MW why Nandipur cost is almost 2 Million USD/MW?


x1980072_83647887.jpg.pagespeed.ic.DNCXi7PutW.webp


Thats a different issue altogether , lets talk about the proposed cost.

Why proposing 14 billion rupees when india done it in 9.5 billion?
 

FahadBhatti

Chief Minister (5k+ posts)
Where and when and for what PTI proposed 14 Billion.

Also if Baloki Power plant can be constructed with 460000 USD / MW why Nandipur cost is almost 2 Million USD/MW?


x1980072_83647887.jpg.pagespeed.ic.DNCXi7PutW.webp


PervezKhattak_9-26-2014_160911_l.jpg


PESHAWAR: Khyber Pakhtunkhwa Chief Minister Pervez Khattak has said that feasibility report has been prepared.
He said that the metro bus track from Nasirpur to Hayatabad would cost Rs14 billion. The chief minister said that the project would cost further Rs45 as the government plans to lay the track on Grand Trunk (GT) road too.

http://www.geo.tv/article-160911-Fe...war-Metro-Bus-project-prepared-Pervez-Khattak


http://www.dawn.com/news/1134261


so was kpk govt trying to do corruption of rs 4.5 billion?
 
Last edited:

Pak1stani

Prime Minister (20k+ posts)
No specification how many KM, how much is the elevated path? Also Amritsar and Lahore Metros were made almost 3 years ago and then include inflation.


now tell me about why Nandpur cost 4 times




PervezKhattak_9-26-2014_160911_l.jpg


PESHAWAR: Khyber Pakhtunkhwa Chief Minister Pervez Khattak has said that feasibility report has been prepared.
He said that the metro bus track from Nasirpur to Hayatabad would cost Rs14 billion. The chief minister said that the project would cost further Rs45 as the government plans to lay the track on Grand Trunk (GT) road too.

http://www.geo.tv/article-160911-Fe...war-Metro-Bus-project-prepared-Pervez-Khattak

 

FahadBhatti

Chief Minister (5k+ posts)
No specification how many KM, how much is the elevated path? Also Amritsar and Lahore Metros were made almost 3 years ago and then include inflation.


now tell me about why Nandpur cost 4 times

amritsar is starting operating next month and was proposed in 2013 and peshawer bus project was proposed in 2014. 26 km route. 1 year and 4.5 ka proposed teeka?
 

Pak1stani

Prime Minister (20k+ posts)
how much was the elevated track. share the official details of Peshawar project if you have.

amritsar is starting operating next month and was proposed in 2013 and peshawer bus project was proposed in 2014. 26 km route. 1 year and 4.5 ka proposed teeka?
 

Back
Top