China's state-owned Huaneng Shandong will own 51% & the Shandong Ruyi Science Group, which will hold 49%.

Nawaz aur Shahbaz ka kia kamal?

Infact they got free huge land


The project site spans a total of 690 hectares (1,700 acres),[SUP][9][/SUP] given by the Government of Punjab free of charge

The Sahiwal Coal Power Project is a coal power plant project 15 kilometers (9.3 mi) to the northeast of Sahiwal in Pakistan'sProvince which is currently under construction.[SUP][1][/SUP] The power plant will be Pakistan's first supercritical coal power plant, and will consist of two 660-megawatt (890,000 hp) plants for a combined capacity of 1,320 MW in the first phase,[SUP][2][/SUP] and is to be followed by a possible second phase which will include two 1,000-megawatt (1,300,000 hp) plants.[SUP][3]

[/SUP]
Thar-coal-power-plant-660x330.jpg

Though the plant is now considered to be part of the China Pakistan Economic Corridor (CPEC) which was announced in April 2015, symbolic ground breaking for the project actually preceded the announcement of CPEC and took place in May 2014,[SUP][4][/SUP] as the government of Punjab in March 2014 invited bids for the construction of two 660MW power plants in order to help alleviate Pakistan's energy shortfalls.[SUP][5]
[/SUP]
The plant is being constructed by a joint consortium of China's state-owned Huaneng Shandong which will own 51% of shares, and the Shandong Ruyi Science & Technology Group, which will hold 49% of shares.[SUP][6][/SUP] The Government of Pakistan will purchase electricity from the consortium at a tariff of 8.3601 US Cents/kWh.[SUP][7][/SUP] The project will be built on a build, operate, transfer basis in which the plant's ownership will be transferred to the Government of Punjab after 30 years of operation.[SUP][8]

[/SUP]
Project Details[edit]

The project site spans a total of 690 hectares (1,700 acres),[SUP][9][/SUP] given by the Government of Punjab free of charge.[SUP][10][/SUP] The project will consist not only of the power plants themselves, but also will include the construction of a railway from the village of Yusuf Wala to the site for exclusive use of the plant.[SUP][11]
[/SUP]
The plants will each consist of one boiler, steam turbine and generator, and will be fueled by sub-bituminous coal which will be offloaded at the project's purpose-built rail terminus.[SUP][12][/SUP] The plants will be able to generate a total of 1,320 megawatts of electricity, with a gross efficiency of 42.11% [SUP][13][/SUP] by the use of a supercritical steam generator operating at temperatures of up to 580 degrees Celsius.[SUP][14]
[/SUP]
The plant will include an air quality monitoring stations, and an electrostatic precipitator in order to reduce ash and sulfur emissions from the plant.[SUP][15][/SUP] It will require 60,000 cubic meters of water daily for operation, with water being drawn from the Lower Bari Doab Canal.[SUP][16][/SUP] Raw materials for the plant, including cement, sand, wood, and other buildings materials are being sourced from Pakistan, while furniture from the plants is being procured specifically from markets in nearby Sahiwal.[SUP][17]
[/SUP]
Construction[edit]

While symbolic ground breaking for the project took place in May 2014,[SUP][18][/SUP] commencement of actual civil works began on February 6, 2015.[SUP][19][/SUP] The first of the two 660MW plants is expected to be put into operation on May 20, 2017, while the second 660MW plant will be put into operation on June, 2017.[SUP][20][/SUP] An estimated 350 personnel will be required to operate the plant,[SUP][21][/SUP] including 200 Pakistani engineers who are to undergo training in China.[SUP][22][/SUP] Approximately 3000 laborers are required for construction of the plant.[SUP][23]
[/SUP]
Boiler foundations, and the plant's turbine steel structure have been completed, while the 9-storey tall boiler structure, chimneys, and cooling towers are under construction as of May 2016.[SUP][24][/SUP] In order to transport coal, a purpose built railway line will be built from the Pakistan Railway at Yusuf Wala to the power plant itself.[SUP][25][/SUP] From there, the coal will be transported via the purpose built railway line. In order to assist in coal transportation, Pakistan Railways has signed a $214 million contract for the purchase of 55 diesel electric locomotives from General Electric.[SUP][26][/SUP] Pakistan Railways will also procure a further 20 diesel electric locomotives specifically for coal transport.[SUP][27][/SUP] In January 2016,

the Pakistan Railways signed a $37 million contract with Jinan Railway Vehicles Equipment Company for the supply of 800 hopper wagons which will be used to transport coal to the Sahiwal Coal Power Plant;[SUP][28][/SUP] 580 of these wagons are to be constructed at the Mughalpura railway workshop.[SUP][29][/SUP]In order to connect the plant to the national electrical grid, a 9.5 kilometer 500 kilovolt single circuit transmission line will be constructed from the site to the Sahiwal Substation.[SUP][30]
[/SUP]
Coal Source[edit]

As with the Pakistan Port Qasim Power Project, most of the coal used for the power plant will be imported from Indonesia and South Africa, and will be transported by rail from the Port of Karachi and Port Qasim in Pakistan's Sindh Province to the nearby village of Yusuf Wala on Pakistan's existing railway infrastructure.[SUP][31]
[/SUP]
An estimated 4.48 million tons of coal will be required annually for the plant, based on a calculation of 22 hours of power generation per day.[SUP][32][/SUP] Indonesia is identified as a primary source for its high quality coal, reliable production, and short transit times to Pakistan.[SUP][33][/SUP] Coal from Pakistan's own Thar coalfield was found to contain excessive amounts of sulfur and lime, and was not deemed to be of high enough quality for the project.[SUP][34][/SUP]

The supply of reliable coal from the fields was also considered to be inadequate.[SUP][34][/SUP] A mixture of Pakistani indigenous coal with imported coal was also deemed to be unsuitable as it would decrease heat production from coal, and would compromise safety of the boilers which are to be used in the project.[SUP][34]

[/SUP]
Source




 
Last edited:
Advertisement
What is wrong with that? Most of power plants are owned by private companies and that is the right policy. Govt should also privatise power netwrok and all discos. Everywhere in the world power plants and suppliers are private and it is upto supplier to choose cheap supplier. In UK there are about 10 different suppliers and you pick which one is cheaper.
 
Advertisement
Loan ley ker Roads bana do, Subcidy dey kar Metro chala lo. Aur apney
karobar ki baari aye to 25 Million 8 Billions mein mein convert ho gaye.

 
China sey ziada Kameeni Qom dunya mein nahin. Woh sirf apna interest dekhteh hain aur
in ganjon ney mulk sara bech dala un ko.
 
Not soon before this goes down the line of Nandipur and Jinnah Solar and Pakistan is bursting with coal, then why is coal being imported from Indonesia and S.Africa. Local coal will always have some problems because you don't get to make massive commission on it. And with the gazillion megawatts added to the national grid everyday on inauguration of some powerplant or the other, why is there still loadshedding ? Instead of getting better its getting worse, So where are these billions of megawatts going?
 
Advertisement
My Question is phir is mein Nawaz aur Shahbaz ka kia kamal?
Woh har kissi ki tatti ke ooper bhait ke bolte hai yeh humne ki hai. 90% of these projects this duo of natthu and phattu inaugurate have nothing to do with them. Inko sirf muft ka credit aur photoshoot lene aati hai
 
What is wrong with that? Most of power plants are owned by private companies and that is the right policy. Govt should also privatise power netwrok and all discos. Everywhere in the world power plants and suppliers are private and it is upto supplier to choose cheap supplier. In UK there are about 10 different suppliers and you pick which one is cheaper.

private company k liye hukamti khazye (tax Payers k pasiye) sai advertisement bhi hoti hia world main kia ?

DArWDT5WsAE9NXq.jpg
 
And Pakistani Nation is most honest on this planet. Americans are agitating on roads to provide us governance like Pakistan?
China sey ziada Kameeni Qom dunya mein nahin. Woh sirf apna interest dekhteh hain aur
in ganjon ney mulk sara bech dala un ko.
 
Advertisement
Correction pleas the only project which is built by government are in-operable, private businesses are flourishing.

Not soon before this goes down the line of Nandipur and Jinnah Solar and Pakistan is bursting with coal, then why is coal being imported from Indonesia and S.Africa. Local coal will always have some problems because you don't get to make massive commission on it. And with the gazillion megawatts added to the national grid everyday on inauguration of some powerplant or the other, why is there still loadshedding ? Instead of getting better its getting worse, So where are these billions of megawatts going?
 
What is wrong with that? Most of power plants are owned by private companies and that is the right policy. Govt should also privatise power netwrok and all discos. Everywhere in the world power plants and suppliers are private and it is upto supplier to choose cheap supplier. In UK there are about 10 different suppliers and you pick which one is cheaper.

Wow what a logic.......Give all the assets to foreign countries and private companies to be at their mercy and control they will f*uck U up whenever they will. As U are getting screwed by K-Electric and Rental Power. What the usurpers have to do is push few bucks in the back holes of Kharam Khor ruling elite whose all the assets are abroad.
 
Pakistan Bara-e-Farokht...


China has build this project on BOT (Build-operate-transfer) basis. They have build it, they will now operate it and will transfer the plant to Govt. of Pakistan after 30 years.

China will have to pay for all the cost during 30 years of operation and will just earn profit by selling the electricity to Govt. of Pakistan.

So na zameen kahin ja rahi hai aur plant.

My Question is phir is mein Nawaz aur Shahbaz ka kia kamal?

Koi kamal nai, bs china ka waisay hi dil kia kay project punjab mein lagayain,
 