batain and Pti jihadis say batain karwa lo ,project is 450 Mgw if it runs at fuel and will be 550 Mgw if it run at gas project will be completed in December 2014 since the start of first 100 Mgw they will add up 100 Mgw after every two months on the system ,contract with Qatar for gas is going on and Pakistan will start getting gas from it in December or November through terminal which they are installing in Karachi port and they will use that gas and industry will get that gas and Cng sector will also get that gas Pti walo say allegation or naray jo marzi Lagwa lo in say koi contrastive Kam hazam no hota
yeh kia wikipedia say copy kia hai? aik spelling sahi nahi hai aur lagay nawaz ko defend karne. kuch parh likh lia hota to aaj tum bhi yeh fake projects band karwa rahe hotay. sab chor do yeh ganjjay ke liay jo 50 lacs ka gate banwaya tha, 14 august ke baad nawaz shariff isi project par rehnay wala hai? shehron main to isay jaga deni nahi hai logon nay
acha bhout jazbati batain ho gi prove me wrong :)
batain and Pti jihadis say batain karwa lo ,project is 450 Mgw if it runs at fuel and will be 550 Mgw if it run at gas project will be completed in December 2014 since the start of first 100 Mgw they will add up 100 Mgw after every two months on the system ,contract with Qatar for gas is going on and Pakistan will start getting gas from it in December or November through terminal which they are installing in Karachi port and they will use that gas and industry will get that gas and Cng sector will also get that gas Pti walo say allegation or naray jo marzi Lagwa lo in say koi contrastive Kam hazam no hota
batain and Pti jihadis say batain karwa lo ,project is 450 Mgw if it runs at fuel and will be 550 Mgw if it run at gas project will be completed in December 2014 since the start of first 100 Mgw they will add up 100 Mgw after every two months on the system ,contract with Qatar for gas is going on and Pakistan will start getting gas from it in December or November through terminal which they are installing in Karachi port and they will use that gas and industry will get that gas and Cng sector will also get that gas Pti walo say allegation or naray jo marzi Lagwa lo in say koi contrastive Kam hazam no hota
apni tindon parr to baal lagwa liay in ganjooooooooo heejron ney aur awam ki tinddd karrdiیہ حکومت بندر کے ہاتھ میں استرا ہے پاکستانیوں کی ٹنڈ ہو رہی ہے ان کو ووٹ دینے کے جرم میں اور کچھ کی ووٹ نہ دینے کے جرم میں.اب وہ جتنا مرضی عوام کو بیقوف بنائیں یا مال کھائیں .کسی کو کیا؟
lol noron ko kuch prove bhi kar do, manna kahan hai tum logon nay. laton kay bhoot baton say kahan mante hain my fellow citizen. tumhara jawab bas 14 ko hi diya jaye ga. ab proof aur evidence ka time chala gaya.
Abe Ch**** patwari. Is se acha tha 5 saal main complete karte hydel pe. Ab Furnace oil pe Rs 22 price parege per unit woh furnace oil tumhari ***** se nikaleingay? Gas Punjab walay khud doosre provinces ki le rahe hain. Gas ki wajah faisalabad ki industry band pari. Gharon main pressure nahi. CNG 3 din milti hai or Gas pe bijli generate karke teer marlia. Gas kia mian Nooray sharif ko nihari khilakay us ki ***** se nikalogai. Tum log Ch**** kai Ch***** he rahogai.
batain and Pti jihadis say batain karwa lo ,project is 450 Mgw if it runs at fuel and will be 550 Mgw if it run at gas project will be completed in December 2014 since the start of first 100 Mgw they will add up 100 Mgw after every two months on the system ,contract with Qatar for gas is going on and Pakistan will start getting gas from it in December or November through terminal which they are installing in Karachi port and they will use that gas and industry will get that gas and Cng sector will also get that gas Pti walo say allegation or naray jo marzi Lagwa lo in say koi contrastive Kam hazam no hota
Source of this information please I dont think what you are telling is the way it will be done!!!!!
batain and Pti jihadis say batain karwa lo ,project is 450 Mgw if it runs at fuel and will be 550 Mgw if it run at gas project will be completed in December 2014 since the start of first 100 Mgw they will add up 100 Mgw after every two months on the system ,contract with Qatar for gas is going on and Pakistan will start getting gas from it in December or November through terminal which they are installing in Karachi port and they will use that gas and industry will get that gas and Cng sector will also get that gas Pti walo say allegation or naray jo marzi Lagwa lo in say koi contrastive Kam hazam no hota
Lol just check your answer when you have nothing to say just comeup with bashing allegations without proves anyways keep dreaming don't want waste time at you