10،000 MW بجلی کی پیداوار میں اضافہ

سابقہ حکومت نے دعوی کیا ھے کہ ان کے دور حکومت میں بجلی کی پیداوار میں 10،000 میگا واٹ کا اضافہ کیا گیا ھے۔ کوئی بھائی اس کی تفصیل فراھم کر سکتا ھے؟؟


ساتھ ھی ساتھ کیا کوئی بھائی یہ بتائے گا کہ گردشی قرض کی اس وقت مالیت کیا ھے؟؟

List-of-Thermal-Power-Stations-in-Pakistan.jpg
​
 
Last edited by a moderator:
Advertisement
سب سے پہلے تو نواز گورنمنٹ کی باتوں پر اعتبار کرنے والوں کی عقل پر ماتم کرنا چاہیے۔
محترم یہ سوال کا جواب نہی ھے۔ امید ھے سوال کا سنجیدہ جواب کوئی نہ کوئی ضرور دے گا۔۔
 
10,000 MW is a hypothetical figure floated by PMLN, based on projects that are in the works, or are dependent on timely supply of coal, full value derivation, and availability of water in dams. Actual figure produced is much less. And even that is intermittent.

Circular debt is close to $10 billion. They created a monstrous mess, and are now leaving it for the next govt to get ruined by.
 
10,000 MW is a hypothetical figure floated by PMLN, based on projects that are in the works, or are dependent on timely supply of coal, full value derivation, and availability of water in dams. Actual figure produced is much less. And even that is intermittent.
if there is no production or a few thousand mega watts production then what is the reason that the duration of load shedding is far less than before. ?
i need a logical answer. regards.
 
if there is no production or a few thousand mega watts production then what is the reason that the duration of load shedding is far less than before. ?
i need a logical answer. regards.

Duration is not less. What PMLN did was reroute loadshedding. During PPP tenure, all the country used to suffer from 12 hour outages. PMLN increased load shedding in poorer areas to up to 18 hours, and decreased, or eliminated it in industrial and affluent areas, where recovery was better.
Since affluent areas are more in the limelight, it was thought that loadshedding was down overall.

Fact of the matter is, that WAPDA grid doesnt have the capacity to carry more than 18GW of power. Pakistan had a production capacity of almost 25GW even during PPP regime. But the grid simply wasnt capable....and PMLN has done very little to imrprove that grid...instead, they established projects that supposedly throw out 10GW power, with no lines to run them on.
 
Production was never an issue is PPP era too. Installed capacity is 20000 MW plus but due to higher cost of production plants on furnace oil are avaoided to avoid circular debt accumulation. In PPP time at end of their govt circular debt was 500 billion roughly pmln govt paid that in first month and now it is 1000 billion. Also price per unit is higher than 2013 whereas oil cost is less than what was in 2013 and still circular debt doubled that's a million dollar question how. So production is not an issue its the price.
 
Advertisement
I need figures to illustrate 10000 MW production. i need to know about the plants that are producing such an enormous amount of electricity.