طویل ترین انڈر پاس مکمل، شہباز شریف نے تصاویر جاری کردیں

وزیر اعلیٰ پنجاب میاں شہباز شریف کہتے ہیں کہ کینال روڈ کا بیجنگ انڈر پاس لاہور کا طویل ترین انڈر پاس ہے۔

l_411782_031619_updates.jpg


Lahore_02.jpg


Lahore_03.jpg


Lahore_04.jpg


Lahore_06.jpg
 
Last edited by a moderator:
Advertisement
اس جنونی مستری نے پورے پنجاب کا پیسا لاہور اور لاہور میں بھی صرف سڑکوں پلوں اور انڈر پاس وغیرہ پہ لگا دیا ہے اور حال یہ ہے کہ لاہور کی ہر سڑک پہ ٹریفک جام ہے
 
اعوان صاب۔۔ میاں برادران کو سمجھائیں۔۔ سڑکوں پُلوں کے ٹینڈر بھریں اور ٹھیکے لیں۔۔
کہاں سیاست میں کھجل خراب ہو رہے ہیں۔۔

ان کم عقلوں کو سوائے سڑک اور پُل کے کچھ نظر نہیں آتا۔۔۔
 
I am not sure, why was this underpass made because I dont see any traffic cross over/interchange at all. It seems both roads on either side of the canal bank run parallel to each other all along the canal. Why was the under pass made exactly?
 
Advertisement
I am not sure, why was this underpass made because I dont see any traffic cross over/interchange at all. It seems both roads on either side of the canal bank run parallel to each other all along the canal. Why was the under pass made exactly?

For commission!
 
For commission!

Yes that's probably the reason for this expansive design because the only crossover I can see is that small 2 lane elevated section shown in second photo. But that elevated u turn could have been made without the underpass.

I guess the under pass could also come in handy during monsoon season when the canal overflows its banks. The extra water storage will save the adjacent homes and population from flooding
 
Yes that's probably the reason for this expansive design because the only crossover I can see is that small 2 lane elevated section shown in second photo. But that elevated u turn could have been made without the underpass.

I guess the under pass could also come in handy during monsoon season when the canal overflows its banks. The extra water storage will save the adjacent homes and population from flooding

The money could have been better spent on dredging the canal so water doesn't overflow in rainy season.