حکومت2لاکھ 72ہزارڈالرروزانہ مفت میں اینگروکمپنی کوکیوں اداکررہی ہے؟

Advertisement
انہوں نے ایل اینجی کو ری گیسیفائی کرکے دینا ہوتا ہے اسکا معاوضہ دیا جاتا ہے مفت میں نہیں دئے جاتے
 
انہوں نے ایل اینجی کو ری گیسیفائی کرکے دینا ہوتا ہے اسکا معاوضہ دیا جاتا ہے مفت میں نہیں دئے جاتے

That is an incorrect way of referring to this charge.
If there is LNG to be regassed, Engro gets paid according to quantity (minimum being $272,000). If the regassification cost is less than $272,000, govt still pays a minimum of $272,000. And the worst....if the govt fails to import LNG on time, and the plant sits idle, the govt still pays them $272,000.

This is reflective of the shoddy deal that PPP made with the IPPs in 1995, the fruits of which we are bearing to this day.
 
Advertisement
That is an incorrect way of referring to this charge.
If there is LNG to be regassed, Engro gets paid according to quantity (minimum being $272,000). If the regassification cost is less than $272,000, govt still pays a minimum of $272,000. And the worst....if the govt fails to import LNG on time, and the plant sits idle, the govt still pays them $272,000.

This is reflective of the shoddy deal that PPP made with the IPPs in 1995, the fruits of which we are bearing to this day.
Yes the extra cost represent Kickbacks(benefit given + benefit taken)
 
That is an incorrect way of referring to this charge.
If there is LNG to be regassed, Engro gets paid according to quantity (minimum being $272,000). If the regassification cost is less than $272,000, govt still pays a minimum of $272,000. And the worst....if the govt fails to import LNG on time, and the plant sits idle, the govt still pays them $272,000.

This is reflective of the shoddy deal that PPP made with the IPPs in 1995, the fruits of which we are bearing to this day.

The governments have to give some assurances to overcome risks in investment in such projects. This may be the part of agreement but I couldn't find such a clause in the agreement of SNGPL,PSO&SSGPL& ENGRO. If the GoP couldn't import the sufficient LNG in time(BTW this never happen in previous two years of operations), what is the fault of investor??
 
Advertisement
The governments have to give some assurances to overcome risks in investment in such projects. This may be the part of agreement but I couldn't find such a clause in the agreement of SNGPL,PSO&SSGPL& ENGRO. If the GoP couldn't import the sufficient LNG in time(BTW this never happen in previous two years of operations), what is the fault of investor??

Then why did PMLN go to court over the IPP contracts?
Providing a private firm with a sovereign guarantee is akin to providing them with the remote control for the government. Everyone knows these agreements were made in bad faith. When an investor invests in a project, it is with the understanding that profit and loss will go hand in hand. If the investor is guaranteed profits, then that is a kickback, not an agreement.
 
Then why did PMLN go to court over the IPP contracts?
Providing a private firm with a sovereign guarantee is akin to providing them with the remote control for the government. Everyone knows these agreements were made in bad faith. When an investor invests in a project, it is with the understanding that profit and loss will go hand in hand. If the investor is guaranteed profits, then that is a kickback, not an agreement.

That was not the only reason to go to the court against IPPs or RPPs. The rate of purchasing electricity was main factor behind that litigation. In this case the country was in dire need importing LNG so the government agreed on tougher conditions. The later projects of re-gasifing terminals were much cheaper with less obligations.
 
That was not the only reason to go to the court against IPPs or RPPs. The rate of purchasing electricity was main factor behind that litigation. In this case the country was in dire need importing LNG so the government agreed on tougher conditions. The later projects of re-gasifing terminals were much cheaper with less obligations.

Rate of purchase was high, and payment terms were criminal. And funnily enough, the exact same defense was cited by Engro, even using IPP contracts as a reference, when NAB was investigating the contract 3 years ago. There defense was that there is precedence for such an agreement in the form of IPP deals.

And just to update you, Elengy terminal ahs a capacity of 600 cu.ft of gas per day....but is working iwth a max of 400 cu.ft (In the first year, it was even lower). So basically, even though the max being processed daily is about 2/3rd the capacity, they are being paid for the entire 600 cu.ft as capacity charge.

The overhead charges are working fast to nullify any benefit received from the price of gas itself. There are many holes in this story, most of which have been covered with masking tape by the govt...and no doubt will be revealed onec this govt is out.
 
Advertisement
Rate of purchase was high, and payment terms were criminal. And funnily enough, the exact same defense was cited by Engro, even using IPP contracts as a reference, when NAB was investigating the contract 3 years ago. There defense was that there is precedence for such an agreement in the form of IPP deals.

And just to update you, Elengy terminal ahs a capacity of 600 cu.ft of gas per day....but is working iwth a max of 400 cu.ft (In the first year, it was even lower). So basically, even though the max being processed daily is about 2/3rd the capacity, they are being paid for the entire 600 cu.ft as capacity charge.

The overhead charges are working fast to nullify any benefit received from the price of gas itself. There are many holes in this story, most of which have been covered with masking tape by the govt...and no doubt will be revealed onec this govt is out.

The first phase of this project was with capacity of 400 CFT, they added another 200 CFT a year later. Pakistan is not bound to pay for idle capacity, the rate of re-gasification came down to 0.046 cent per BTU against the earlier rates of 0.066 cents per BTU. Another floating terminal with the capacity of 600 cu.ft will be operational in a month or so.
 
The first phase of this project was with capacity of 400 CFT, they added another 200 CFT a year later. Pakistan is not bound to pay for idle capacity, the rate of re-gasification came down to 0.046 cent per BTU against the earlier rates of 0.066 cents per BTU. Another floating terminal with the capacity of 600 cu.ft will be operational in a month or so.

The first phase was with a capacity of 200cf....which increased to 400 last year. The regasification rate will naturally come down as production goes up, but the overall payout is guaranteed at an average of $220,000 over the course of the 15 year contract. And yes, the govt (read public) is paying a capacity charge! Not sure why you would insist on falsifying a fact just to prove a point.

Nab Investigates LNG contract (2015)

Engro Corporation CEO Khalid Siraj Subhani, who was also present at the press talk, said the company’s investment was based on utilisation and the model was already being implemented.
“The government is required to pay capacity costs to the independent power producers (IPPs) if the capacity of power plants is not used and the same model is applied to the utilisation of LNG terminal,” he said.
 