Priorties of KPK VS PUNJAB Punjab building Metro..... KPK Building Dams
Mr Pervez Khattak, Chief Minister Khyber Pakhtunkhwa will perform ground breaking ceremony of 40.8 MW Koto Hydropower Project, District Dir (Lower)
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
Name of River : Panjkora
Location : Near Timergara
Discharge : 126 Cusecs
Head : 38 Meters
Capacity : 40.8 MW
Tunnel Length : 1.76 Km
Energy : 205 Gwh
Revised cost of project : Rs: 14.765 Billion
Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
Completion : Dec 2018
Mr Pervez Khattak, Chief Minister Khyber Pakhtunkhwa will perform ground breaking ceremony of 40.8 MW Koto Hydropower Project, District Dir (Lower)
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
Name of River : Panjkora
Location : Near Timergara
Discharge : 126 Cusecs
Head : 38 Meters
Capacity : 40.8 MW
Tunnel Length : 1.76 Km
Energy : 205 Gwh
Revised cost of project : Rs: 14.765 Billion
Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
Completion : Dec 2018