Can somebody please give some links or some official material highlighting the facts the Bhikki power plant is back to normal operation (not working on half of the Capacity).
JAK
JAK
Even though in one of the picture above , the AD mentions 1180 MW to be produced, but the articles I read so far are claiming that the plant is designed 750MW. Maybe 1180 MW would be something which will come in future like phase II.اس پاور پلانٹ سے ہندوستان، ایران اور افغانستان کو بجلی ایکسپورٹ کرنے کی تیاریاں ہیں قریباً ایک لاکھ
!میگا واٹ فالتو بجلی بن رہی ہے روزانہ
سریا بیچنے کے چکر ہیں سارے یہ
Even though in one of the picture above , the AD mentions 1180 MW to be produced, but the articles I read so far are claiming that the plant is designed 750MW. Maybe 1180 MW would be something which will come in future like phase II.
Sawal Gandum, Jawab Channa.[video]https://www.facebook.com/PakistanPunch/videos/838553789627755/[/video]