Status of 365 Micro Hydro and other Hydro projects in KPK

najeebahmad

MPA (400+ posts)
365 Micro Hydro Power Projects(MHPP):
  • 260 were completed by Dec 2017
  • 365 set to complete by June 2018
These provide very cheap electricity. These units are managed by local people on their own after government did the initial build.

Extension of 365 Micro Hydro Power Projects:
  • This project is extended to 1000 MHPP
  • 635 MHPP will be constructed by the next KPK government (likely PTI per all the latest surveys)
Other Hydro Projects completed by PTI government:
  • Ranolia HPP (Kohistan) : 17 MW completed: March 2015
  • Machai HPP(Mardan): 2.6 MW completed: March 2015
  • Daral Khwar HPP(Swat): 36.6 MW completed: December 2015
Federal government is delaying to connect these to the national grid as they want to make money from imported LNG used for power generation.

KPK-micro-hydropower-plants-power-plants.jpg


Projects planned to complete in 2018
  • Jabori HPP (Mansehra): 10.2 MW
  • Karora HPP (Shangla): 11.8 MW

Projects planned to complete in 2019
  • Koto HPP (Lower Dir): 40 MW
  • Matiltan HPP (Swat): 84 MW
  • Lawi HPP (Chitral): 69 MW

Projects planned to complete by 2022
  • Naran Dam HPP (Mansehra): 168 MW
  • Sharmai HPP (Upper Dir): 150 MW
  • Shigokach HPP (Lower Dir): 102 MW
  • Arkari GOL HPP (Chitral): 99 MW
  • Batakundi HPP (Mansehra): 96 MW
  • Ghor Band HPP (Shangla): 21 MW
  • Nandihar HPP (Battagram): 12 MW

Source: http://insaf.pk/public/insafpk/tabdeeli-ka-safar/performance-kpk-govt-power-sector-5-years
 
Last edited by a moderator:

fawad ali

Chief Minister (5k+ posts)
The problem is that these 365 micro hydro plants combined together produce less electricity than what one commercial plaza consumes in karachi. Pti should have gone for much much bigger projects.
 

Arshad50

Senator (1k+ posts)
ye acha step hei kiun ke is se sasti bijli produce hoti hei yani 3 rupe se le kar 5 rupey tak unit magar badqismati se fedral me aik bakheel party bar sar e iqtedar hey is se each house ka bijli ka bill 600 800 rupey tak hei hamarey mulk me khasee baresheen hoteen hey agar hum os pani ka store kareen or small dem par jain to na to pani ki kami ho gee or na hi bijlee ki
 

Munawarkhan

Chief Minister (5k+ posts)
Actually they provide electricity to remote villages, who never had access to electricity for the last 70 years.

The problem is that these 365 micro hydro plants combined together produce less electricity than what one commercial plaza consumes in karachi. Pti should have gone for much much bigger projects.
 

miafridi

Prime Minister (20k+ posts)
The problem is that these 365 micro hydro plants combined together produce less electricity than what one commercial plaza consumes in karachi. Pti should have gone for much much bigger projects.

The people who are criticizing the Megawatts, produced by this project are ignoring the facts
- These small projects cover a large moutaneous area.
- Connecting these far plunged mountainous areas would have required a lot of resources, time and money to get them connected to national grid.
- Tourists would now find electricity even in the remote areas making tourism easy for them.
- Local will find it easier to accomodate tourists because of electricity facility.
- Students would now even study at night in these remote areas.
- Locals plus the tourists will not be cut of from rest of Pakistan now only because they wouldn't be able to watch TV, and/or charge their phones.
 

liuali

MPA (400+ posts)
The problem is that these 365 micro hydro plants combined together produce less electricity than what one commercial plaza consumes in karachi. Pti should have gone for much much bigger projects.

چترال سے تعلق رکھنے کی بنا پر اس بات کا عینی شاہد ہوں کہ ان پن بجلی کے منصوبوں سے ۳ روپے فی یونٹ بجلی گھر پر میسر ہیں ۲۴ گھنٹے۔ ماہانہ بجلی کا بل ۳۰۰ سے ۴۰۰ روپے کے درمیان آتا ہے۔ بڑے منصوبوں کا ضرور سوچنا چاہیے مگر چھوٹے چھوٹے یہ منصوبے بھی قابل ستائش ہیں۔
 

latif mk

MPA (400+ posts)
200 out of 356 which are already completed is off grid power projects for local community.
Ranolia kohistan 17 MW
Machai mardan 2.6 MW
Darar khwar swat 36 MW
Need to be connected with national grid but federal government doesn’t agree on the prices.
 

Okara

Prime Minister (20k+ posts)
I checked it on google, MW seems to be right as per KPK official web site.
I was assuming most of micro power projects are less than a 1MW but few are bigger. I was wrong thread starter is right.
 

BrotherKantu

Chief Minister (5k+ posts)
قطرے قطرے سے دریا بنتا ہے۔


In the eyes of PMLN, Maryam Nawaz is the only woman who deserves respect. Bull$hit party
The problem is that these 365 micro hydro plants combined together produce less electricity than what one commercial plaza consumes in karachi. Pti should have gone for much much bigger projects.
Actually they provide electricity to remote villages, who never had access to electricity for the last 70 years.