پچھلے دو تین دنوں سے کچھ پکھے غریب اپنے کھوتے تو رنگ کر کر کے زیبرا بنانے کے چکر میں پڑے ہیں - سارے نون لیگ دور کے پاور پروجیکٹس کو اپنے کھوتے پر لادنے کی کوشش میں تھے - اس کا دل تھا کہ صرف جاہل انصافی ہے ان کی کوشش کو دیکھیں اور ڈانس وانس کریں-- پتا نہیں کتنا کامیاب ہوے ہیں بیچارے - لیکن اس کے لئے ایک اور کوشش کا موقع آیا ہے

چلو اوے پکھے غریبو -- لادو اس کو بھی اپنے کھوتے پر

Gulpur power project starts operation
102MW project producing cheap electricity for grid

The Gulpur hydroelectric power project has started certified commercial operation and is producing cheap electricity for the national grid, announced Nespak Managing Director Dr Tahir Masood.

Gulpur is a run-of-the-river hydroelectric power generation project located on Poonch River, a major tributary of Jhelum River near Gulpur, Kotli district, Azad Kashmir.

Project financing was provided by Korea Exim Bank, the Asian Development Bank (ADB), International Finance Corporation (IFC), Islamic Development Bank and ECO Bank. The project has the capability of generating, on average, 102 megawatts of electricity. It was completed in the shortest possible time and became a benchmark in the hydroelectric power sector of Pakistan. It has been built at a total cost of Rs52 billion.

National Engineering Services of Pakistan (Nespak), in a joint venture with MWH Global, provided consultancy services as owner’s engineer to Mira Power Limited, a subsidiary of Kosep, South Korea, for the 102MW Gulpur project.

The local company also helped in successful completion of the project by providing complete technical support to Mira Power in getting approvals from different government agencies.

Published in The Express Tribune, July 9th, 2020.

For Information of everyone other than Imranis. This project started in 2014 and is completed in Record speed in the country's history.
 

3rd_Umpire

Chief Minister (5k+ posts)
106914430_987600868347812_8372501914888728432_o.jpg
 
Last edited:

Arshad50

Senator (1k+ posts)
پچھلے دو تین دنوں سے کچھ پکھے غریب اپنے کھوتے تو رنگ کر کر کے زیبرا بنانے کے چکر میں پڑے ہیں - سارے نون لیگ دور کے پاور پروجیکٹس کو اپنے کھوتے پر لادنے کی کوشش میں تھے - اس کا دل تھا کہ صرف جاہل انصافی ہے ان کی کوشش کو دیکھیں اور ڈانس وانس کریں-- پتا نہیں کتنا کامیاب ہوے ہیں بیچارے - لیکن اس کے لئے ایک اور کوشش کا موقع آیا ہے

چلو اوے پکھے غریبو -- لادو اس کو بھی اپنے کھوتے پر

Gulpur power project starts operation
102MW project producing cheap electricity for grid

The Gulpur hydroelectric power project has started certified commercial operation and is producing cheap electricity for the national grid, announced Nespak Managing Director Dr Tahir Masood.

Gulpur is a run-of-the-river hydroelectric power generation project located on Poonch River, a major tributary of Jhelum River near Gulpur, Kotli district, Azad Kashmir.

Project financing was provided by Korea Exim Bank, the Asian Development Bank (ADB), International Finance Corporation (IFC), Islamic Development Bank and ECO Bank. The project has the capability of generating, on average, 102 megawatts of electricity. It was completed in the shortest possible time and became a benchmark in the hydroelectric power sector of Pakistan. It has been built at a total cost of Rs52 billion.

National Engineering Services of Pakistan (Nespak), in a joint venture with MWH Global, provided consultancy services as owner’s engineer to Mira Power Limited, a subsidiary of Kosep, South Korea, for the 102MW Gulpur project.

The local company also helped in successful completion of the project by providing complete technical support to Mira Power in getting approvals from different government agencies.

Published in The Express Tribune, July 9th, 2020.

For Information of everyone other than Imranis. This project started in 2014 and is completed in Record speed in the country's history.
? ? ? tum bi bilawal ko mardana rang de do lora os par rang ras aye gaa
 

AZ1

Minister (2k+ posts)
Gulpur power project

Thank you Imran khan for not delaying this project or stop funding of it he can easily put hold on projects and its funding and use that funds to somewhere else for political scoring like PMLN and PPP did in past. As per your claim 2014 mei start howa jin honey start kara wo tou chor chaar ke bhag gaye pichey ap ko chor gaye lol. Aur chalo credit lena chahtay ho tou lei lo itni ziyada generate nahi karta yeh electricy just 102MW.
 

Husaink

Prime Minister (20k+ posts)
پچھلے دو تین دنوں سے کچھ پکھے غریب اپنے کھوتے تو رنگ کر کر کے زیبرا بنانے کے چکر میں پڑے ہیں - سارے نون لیگ دور کے پاور پروجیکٹس کو اپنے کھوتے پر لادنے کی کوشش میں تھے - اس کا دل تھا کہ صرف جاہل انصافی ہے ان کی کوشش کو دیکھیں اور ڈانس وانس کریں-- پتا نہیں کتنا کامیاب ہوے ہیں بیچارے - لیکن اس کے لئے ایک اور کوشش کا موقع آیا ہے

چلو اوے پکھے غریبو -- لادو اس کو بھی اپنے کھوتے پر

Gulpur power project starts operation
102MW project producing cheap electricity for grid

The Gulpur hydroelectric power project has started certified commercial operation and is producing cheap electricity for the national grid, announced Nespak Managing Director Dr Tahir Masood.

Gulpur is a run-of-the-river hydroelectric power generation project located on Poonch River, a major tributary of Jhelum River near Gulpur, Kotli district, Azad Kashmir.

Project financing was provided by Korea Exim Bank, the Asian Development Bank (ADB), International Finance Corporation (IFC), Islamic Development Bank and ECO Bank. The project has the capability of generating, on average, 102 megawatts of electricity. It was completed in the shortest possible time and became a benchmark in the hydroelectric power sector of Pakistan. It has been built at a total cost of Rs52 billion.

National Engineering Services of Pakistan (Nespak), in a joint venture with MWH Global, provided consultancy services as owner’s engineer to Mira Power Limited, a subsidiary of Kosep, South Korea, for the 102MW Gulpur project.

The local company also helped in successful completion of the project by providing complete technical support to Mira Power in getting approvals from different government agencies.

Published in The Express Tribune, July 9th, 2020.

For Information of everyone other than Imranis. This project started in 2014 and is completed in Record speed in the country's history.
چشم فلک نے تو یہاں کتے کو شیر بنتے ہوے دیکھا ہے گدھا تو پھر بھی محنتی جانور ہے
 

Husaink

Prime Minister (20k+ posts)
پچھلے دو تین دنوں سے کچھ پکھے غریب اپنے کھوتے تو رنگ کر کر کے زیبرا بنانے کے چکر میں پڑے ہیں - سارے نون لیگ دور کے پاور پروجیکٹس کو اپنے کھوتے پر لادنے کی کوشش میں تھے - اس کا دل تھا کہ صرف جاہل انصافی ہے ان کی کوشش کو دیکھیں اور ڈانس وانس کریں-- پتا نہیں کتنا کامیاب ہوے ہیں بیچارے - لیکن اس کے لئے ایک اور کوشش کا موقع آیا ہے

چلو اوے پکھے غریبو -- لادو اس کو بھی اپنے کھوتے پر

Gulpur power project starts operation
102MW project producing cheap electricity for grid

The Gulpur hydroelectric power project has started certified commercial operation and is producing cheap electricity for the national grid, announced Nespak Managing Director Dr Tahir Masood.

Gulpur is a run-of-the-river hydroelectric power generation project located on Poonch River, a major tributary of Jhelum River near Gulpur, Kotli district, Azad Kashmir.

Project financing was provided by Korea Exim Bank, the Asian Development Bank (ADB), International Finance Corporation (IFC), Islamic Development Bank and ECO Bank. The project has the capability of generating, on average, 102 megawatts of electricity. It was completed in the shortest possible time and became a benchmark in the hydroelectric power sector of Pakistan. It has been built at a total cost of Rs52 billion.

National Engineering Services of Pakistan (Nespak), in a joint venture with MWH Global, provided consultancy services as owner’s engineer to Mira Power Limited, a subsidiary of Kosep, South Korea, for the 102MW Gulpur project.

The local company also helped in successful completion of the project by providing complete technical support to Mira Power in getting approvals from different government agencies.

Published in The Express Tribune, July 9th, 2020.

For Information of everyone other than Imranis. This project started in 2014 and is completed in Record speed in the country's history.
ہائے ہائے ذرا رنڈی رونا تو دیکھو جیسے انکی مسکین بہن مریم نے بھانڈے مانج مانج کر اور محنت مزدروی کرکے یہ منصوبے شروع کیے تھے بے شرم پٹواریو شرم تم کو کبھی نہیں آنی اب موت ہی آنی ہے
 

RajaRawal111

Prime Minister (20k+ posts)
ہائے ہائے ذرا رنڈی رونا تو دیکھو جیسے انکی مسکین بہن مریم نے بھانڈے مانج مانج کر اور محنت مزدروی کرکے یہ منصوبے شروع کیے تھے بے شرم پٹواریو شرم تم کو کبھی نہیں آنی اب موت ہی آنی ہے
نہ کر یار جپانی قسم سے ؟؟؟ --- تیری سیاسی روحانی بے بے آج کل لوگوں کے پانڈے مانج مانج پر مانی مینٹل کو پیسے دے رہی ہے ؟؟
میرے گھر میں بھی کام والی ماسی کی ضررت ہے - معقول تنخواہ دیتے ہیں ہم - ساتھ دوپہر کی روٹی بھی
 

RajaRawal111

Prime Minister (20k+ posts)
چشم فلک نے تو یہاں کتے کو شیر بنتے ہوے دیکھا ہے گدھا تو پھر بھی محنتی جانور ہے
کاش تیرے الے گدھے کو دولتیاں مارنے کے علاوہ بھی کوئی محنت کرنی آتی
 

Husaink

Prime Minister (20k+ posts)
کاش تیرے الے گدھے کو دولتیاں مارنے کے علاوہ بھی کوئی محنت کرنی آتی
دولتیوں نے ہی تو شیر کو دوبارہ کتا بنا دیا ہے اب تمہیں دکھائی نہ دے تو کیا ہو سکتا ہے
 

Husaink

Prime Minister (20k+ posts)
نہ کر یار جپانی قسم سے ؟؟؟ --- تیری سیاسی روحانی بے بے آج کل لوگوں کے پانڈے مانج مانج پر مانی مینٹل کو پیسے دے رہی ہے ؟؟
میرے گھر میں بھی کام والی ماسی کی ضررت ہے - معقول تنخواہ دیتے ہیں ہم - ساتھ دوپہر کی روٹی بھی
ویسے تیری سیاسی بے بے سے ایک گلہ ہے سب کے بھانڈے مانج لیتی قطریوں کے کیوں مانجے ؟
 

RajaRawal111

Prime Minister (20k+ posts)
دولتیوں نے ہی تو شیر کو دوبارہ کتا بنا دیا ہے اب تمہیں دکھائی نہ دے تو کیا ہو سکتا ہے
ویسے تیری سیاسی بے بے سے ایک گلہ ہے سب کے بھانڈے مانج لیتی قطریوں کے کیوں مانجے ؟
? کسی اچھی سی جغت کے آمد نہیں ہو رھی اس وقت
تسی جیتے